Initial stress

From StructuralWiki
Jump to navigation Jump to search

Stress put on a member before the regular loads are applied. This is accomplished by making the member a trifle shorter or longer than the required normal length and then forcing it into place in the structure, or by operating a turnbuckle after erection.